INFRASTRUCTURE

A set-up of 360 nodes equipped with

(1) Intel I5 processor.
(2) Canteen Facility
(3) Waiting area lounge
(4) 2 Wheelers and 4 Wheelers Parking
(5) Separate washroom under exam hall , attach Toilet for Boys & Girls separately
on each Floor
(6) Bag /Baggage Counter
(7) Covered area for candidate entry
(8) Public address system

SYSTEM CONFIGURATION

• Intel i5 processor, 8GB RAM, 19” Acer monitor, 240 GB SSD,
• 80 KVA online UPS (20 KVA 4 online UPS).
• Casset AC 3.5 Ton Daikin Total 6 AC.
• Windows Ac 1.5 Ton Total = 6 AC.
• Split AC 1.5 ton Total 2 AC.
• 125 KVA DG Set.
• 150 KVA Transformer.
• Cat 6 network with Dlink.
• DGS151028X Manageable Switches.
• Backup Lan support Is also Available in Case primary Lan is down.
• Queue Manager for smooth entry of candidates.